Project Operating Conditions: 285,000 m³/h
Project concentration: 300mg
Project operating conditions: 285,000 m³/h, zeolite rotor +CO system, spray painting exhaust gas, concentration 300mg. The equipment selection for the project is based on the concentration and on-site working conditions. Currently, the equipment is operating stably and the discharge at the outlet also meets the local discharge standards.
