Views: 0 Author: Site Editor Publish Time: 2025-04-17 Origin: Site
Project Operating Conditions: 80,000 m³/h
Project Concentration: 500mg
Project operating conditions: 80,000 m³/h, zeolite rotor +CO system, spray painting exhaust gas, concentration 500mg. The equipment selection for the project is based on the concentration and on-site working conditions analysis. Currently, the equipment is operating stably and the discharge at the outlet also meets the local discharge standards.
